Power and cooling for AI data centres
Solo: possibleOne person can test a narrow slice of it.
Why it is still open
Racks now draw over 100 kW, and grids and cooling can't keep up. New sites wait years for power.
An experiment one person can run in 8 weeks
Model the power, water and cost of a 10 MW AI data centre in 3 Indian cities from public data.
Verdict: Solo: possible
A strong explainer built from public data.
The solo test behind the verdict
- Can it be measured? There is a number that shows you did better, such as an error rate, a catch rate or a cost per answer.
- Is it cheap to try? It runs on a laptop, free open models and open data, or under about ₹50,000 of rented GPU time.
- Is there a public yardstick? A benchmark or dataset others use, so your result can be compared and believed.
- Would a small win get noticed? A lab, a funder or a customer would care about a 10% improvement, not only a full solution.
Four yeses means Solo: strong. Two or three means Solo: possible. Fewer means Follow, don't build.